3. Air Conditioning Supply
Air conditioning will not be provided during the move-in and move-out periods. If needed, please visit the information counter on-site and fill out Attachment 8, Application for Air-conditioning Use During Move-in/Move-out on the same day, within the designated time period.
The air-conditioning fee will be calculated on-site by the organizer. Exhibitors must complete full payment on the same day. Invoices will be issued after the event.
The usage fee is NT$10,000 per hour, calculated based on the actual usage time. Any usage less than one hour will still be charged as one full hour.
Air conditioning will be available throughout the entire venue during the exhibition period.
Last updated